REINFORCEMENT RINGS OF THE TUNNEL OF ABDALAJIS IN THE HIGH SPEED TRAIN LINE CORDOBA-MALAGA
Keywords:
High resistance self compacting concrete, High speed train.Abstract
The tunnels located in the high speed
train line going from Cordoba to Ma
laga pass through karstics areas of
approximately one kilometer-long in
Valle de Abdalajís, in the municipality
of Alora (Malaga). During the cons
truction of the tunnel great infiltration
water flows were detected, causing
important soil draggings through dí-
verse fault areas. The adopted solu
tion was the construction of reinfor
cement rings with high resistance self
compacting concretes. The most dif
ficult areas have an 80 MPa resistan
ce value, as for the rest the values are
50MPa and 60 MPa.
The concrete was manufactured
in a plant property of Hormigones y
Minas S.A., located near the entrance
of the tunnels in a piece of land han
ded over by Adif for that purpose.
Hormigones y Minas made an in
vestigation with more than 130 doug
hies and 520 tests to determine the
most appropriate dosage and, as a
result, 22 formulas were found co
rrect. From these 22 formulas the
profiles for the materials to be used
for the manufacturing of the concrete
were obtained, having also present
technical and economical factors.