ADAPTACIÓN DE LOS AEROGENERADORES A LOS NUEVOS REQUISITOS DE RED
Abstract
The grid connection standards for the
connection to the grid of non–con
ventional source of energy are being
fixed all over the world. The fulfil
ment of the grid code requirements
requires from the wind turbine manu
facture to introduce new solutions
and the development of new control
strategies. These requirements are
mainly focused on: fault ride through
capability, reactive power capacity,
frequency control, voltage control,
active power curtailment and others.
The equipment affected by the new
requirements are the generator, the
transformer, the power electronic ele
ments, the electrical and mechanical
protections, etc. The solutions ca
rried out by Gamesa Eolica are sche
matically presented in this paper.